Energy-saving Exterior Hanging Board
  • Energy-saving Exterior Hanging BoardEnergy-saving Exterior Hanging Board
  • Energy-saving Exterior Hanging BoardEnergy-saving Exterior Hanging Board
  • Energy-saving Exterior Hanging BoardEnergy-saving Exterior Hanging Board
  • Energy-saving Exterior Hanging BoardEnergy-saving Exterior Hanging Board
  • Energy-saving Exterior Hanging BoardEnergy-saving Exterior Hanging Board
  • Energy-saving Exterior Hanging BoardEnergy-saving Exterior Hanging Board

Energy-saving Exterior Hanging Board

Jason Building Materials is a professional manufacturer of Energy-saving Exterior Hanging Boards. These panels utilize a dry-installation method involving a mounting framework, eliminating the need for cement mortar or extensive wall demolition and modification. They effectively block thermal transfer in both directions, achieving an overall building energy-saving rate of over 60%.

Jason Building Materials' Energy-saving Exterior Hanging Board features a specialized, weather-resistant finish that reflects UV rays and blocks thermal radiation. The panels are fire-resistant—non-combustible and non-flammable—and emit no toxic fumes, ensuring safety and durability. We invite you to contact Jason Building Materials for OEM customization and direct factory pricing.


What is Energy-Saving Exterior Hanging Board?

Energy-saving exterior hanging board is a thermal decorative panel installed by external hanging method. Its core feature is that installation does not require bonding the panel to the wall, but rather fixing it to the exterior of the building facade through a metal keel system.

This installation method creates an air layer between the panel and the wall, allowing moisture inside the wall to escape while preventing winter condensate from accumulating inside the insulation layer. It is suitable for ultra-low energy consumption building projects with high requirements for wall airtightness.


Energy-saving Exterior Hanging BoardEnergy-saving Exterior Hanging Board


Core Advantages

1. Dry hanging installation: Fast installation speed, unaffected by low temperature, rain or snow. Winter construction does not require consideration of mortar freezing issues like wet systems.

2. No damage to original wall: Especially suitable for energy-saving renovation of existing buildings — adding energy-saving hanging boards to old buildings does not require removing the original exterior wall finish. Keels can be installed directly outside the wall and panels hung, with minimal impact on normal office work inside the building.

3. Flexible disassembly and assembly: Individual panels can be independently removed and replaced, making later maintenance, insulation layer inspection, and exterior wall pipeline renovation convenient.


Old Building Energy-Saving Renovation Construction Process

Standard process for applying energy-saving exterior hanging boards to existing buildings:

Step 1 — Wall Substrate Inspection: Inspect the flatness, strength and moisture content of the original wall. Local leveling with cement mortar is required if flatness deviation exceeds 10mm/m.

Step 2 — Keel Installation: Install galvanized steel keel framework on the outer side of the wall. Keel spacing is determined by panel dimensions and wind pressure calculation, generally 600mm.

Step 3 — Panel Installation: Install panels from top to bottom onto the keel, reserving 5 – 8mm expansion joints between panels.

Step 4 — Sealing Treatment: Insert PE foam strips into panel joints and apply weather-resistant sealant. Use special aluminum alloy internal and external corner pieces at corners.

Step 5 — Finishing Details: Use metal cover plates to trim around windows and at the top of parapet walls to ensure rainwater does not penetrate the inner wall layer.

After renovation, the building energy-saving rate can be improved by 40% – 60%, while achieving an overall facade renewal effect.


Application Areas

Public Building Energy-Saving Renovation — Adding insulation layers to office buildings, hospitals, and schools that have been in use for many years

New Rural Residential Exterior Walls — Simple construction and short lead time for self-built houses

Light Steel Villa Supporting — Compatible with light steel keel structures

Existing Shopping Mall Facade Renovation — Renovation without closing operations; hanging board construction has almost no impact on store business


After-Sales Service

Energy-saving exterior hanging board projects include the following after-sales support:

- One free inspection within 6 months after project completion, checking keel connector tightness and sealant integrity

- Issue feedback channels: Call the 400 after-sales hotline or contact the sales representative; response within 4 hours on working days

- For panel cracking or coating peeling caused by material quality issues, replenishment or replacement will be arranged within 15 days after verification

- For problems caused by improper installation, Jiesen technical staff can assist in identifying causes and providing corrective recommendations


Packaging & Shipping Instructions

Panels are produced and shipped in batches. Each batch is accompanied by the quality inspection report for that batch.

Packaging Method: Flat stack palletizing, no more than 30 boards per pallet, with foam pads between boards. Outer wrapping with stretch film + steel strapping, and paper corner protectors at the four corners. Photos are taken for record before shipment.

Shipping Lead Time: Standard size orders ship in 7 working days; custom size orders ship in 12 – 15 working days.


Energy-Saving Renovation Before & After Comparison Reference

Indicator Before Renovation After Renovation (Hanging Board)
Winter Indoor Temperature 14 – 16°C 20 – 22°C
Monthly Air Conditioning Cost (Summer) Approx. 600 RMB Approx. 400 RMB
Facade Condition Peeling / Dirty Clean / Unified
Construction Impact No impact on daily living


FAQ

Q1: What is the difference between energy-saving exterior hanging board and thermal insulation decorative board?

A1: The main difference is the installation method. Energy-saving exterior hanging boards are installed through a keel dry-hanging system, creating an air layer between the panel and the wall. Thermal insulation decorative boards are directly bonded to the wall. The hanging method is more suitable for old building renovation as it does not damage the original wall.

Q2: How much does the energy-saving rate improve after installation?

A2: The building energy-saving rate can be improved by 40% – 60%, depending on the original wall condition and the thickness of the insulation layer selected.

Q3: Does the air layer between the panel and the wall cause condensation?

A3: No. The air layer is ventilated and allows moisture to escape, preventing condensation inside the insulation layer. This is one of the key advantages of the dry-hanging system for building envelope design.

Energy-saving Exterior Hanging Board


Hot Tags: Energy-saving exterior hanging board, exterior wall cladding panels, thermal insulation exterior board
Send Inquiry
Contact Info

Zibo Jiesen Building Materials Environmental Protection Technology Co., Ltd.

Company Address

Chengxi Village, Xincheng Town, Huantai County, Zibo City, Shandong Province, China

Contact Information

X
We use cookies to offer you a better browsing experience, analyze site traffic and personalize content. By using this site, you agree to our use of cookies.Privacy Policy